The meeting was opened with prayer.The purpose of the meeting was to continue to discuss the layout of the proposed multi-purpose addition.
The meeting proceeded as follows:
- The Team reviewed Design 1 Revision 3 layouts and discussed changes.
- It was agreed that the addition roof line should be dropped below the sanctuary roof line and the the main wall (along Lincoln Ave) should be set back at least 2 feet from the sanctuary wall (inside the column line). This is so that the sanctuary building will be "proud" to the addition for appearance purposes.
- The rental house will need to be taken down to allow access around the addition.
- The sanctuary will need to be turned around.
The following action items were agreed to:
1) Actual sanctuary building dimensions will be taken and forwarded to US Steel. - Carl
2) A verbal report will be given at the November 25 Town Hall Meeting. - Richard
3) Create possible floor plans for addition space. - Team
The next meeting will be called when US Steel has completed the latest revision.