Project Team Minutes November 18, 2007

The Project Team met on November 18, between the second and third services. Carl, Dale, Pat and Richard were present, Pastor Bob was out of town.

The meeting was opened with prayer.The purpose of the meeting was to continue to discuss the layout of the proposed multi-purpose addition.

The meeting proceeded as follows:

  • The Team reviewed Design 1 Revision 3 layouts and discussed changes.
  • It was agreed that the addition roof line should be dropped below the sanctuary roof line and the the main wall (along Lincoln Ave) should be set back at least 2 feet from the sanctuary wall (inside the column line). This is so that the sanctuary building will be "proud" to the addition for appearance purposes.
  • The rental house will need to be taken down to allow access around the addition.
  • The sanctuary will need to be turned around.

The following action items were agreed to:

1) Actual sanctuary building dimensions will be taken and forwarded to US Steel. - Carl

2) A verbal report will be given at the November 25 Town Hall Meeting. - Richard

3) Create possible floor plans for addition space. - Team

The next meeting will be called when US Steel has completed the latest revision.