The meeting proceeded as follows:
Pastor Bob prayed for the Team and our mission.
- The latest revision of the layouts from General Steel were discussed and the Team agreed to the general layout with one change to the roof line.
- Carl presented a preliminary floor plan for the addition given the agreement to exterior dimensions.
- The Team discussed the possible changing of the Lincoln Avenue entrance to break up the line between the Sanctuary and the multipurpose building.
- Miscellaneous items were discussed and added to the Project Team Issues List for future consideration.
As a result of this meeting the following Action Items were agreed to:
1) Receive design changes to the roof line (per Dale's and Carl's e-mails) and facility foot print from General Steel. - Carl
2) Review possible floor plan options with architect Daryl Drake. - Dale and Richard
3) Continue work on Congregational Power Point presentation. - Dale
The next meeting was scheduled for Tuesday December 18, 2007 at 6:00 PM at the Church.