The Project Team met at the Church between 2nd and 3rd services on March 15, 2009. All members were present and the meeting was opened in prayer by Pastor Bob.
The meeting proceeded as follows:
* The site plan drawing from Architect Daryl Drake was reviewed. The Team was pleased with the drawing and discussed changes that need to be made prior to final submittal.
* After discussing changes that the new building will require to the parking lot, the Team agreed that the rental house will need to be removed to leave adequate clearance around the addition.
* Minor changes to the drawing with respect to the rear entrance awning, and the Lincoln Avenue entrance at the rear of the sanctuary were also agreed to. Finally a ramp to the lower level of the addition and a location for the Church’s dumpster were discussed and agreed to.
As a result of this meeting the following action items were agreed to:
1) Communicate final changes to the site plan to the architect, Daryl Drake. - Dale
2) When the site plan is completed, contact Lois Ramon and arrange a meeting to present the site plan to the City Planning Department. - Richard
The next meeting will be scheduled when these action items are completed.